Danaos

Why Ship Managers Need a Project Management Platform for Shipbuilding, Drydocking and Maritime Projects

Shipbuilding, drydocking, retrofits and major vessel upgrades are not routine ship-management activities. They are capital projects. And capital projects require project-level control.

 

For a shipowner or ship manager, sending a vessel to a shipyard creates a temporary but critical operational environment involving the owner’s technical team, shipyard, subcontractors, suppliers, classification societies, equipment manufacturers, banks, charterers and insurers.

 

Millions of dollars can be committed within weeks. Hundreds or thousands of work items may be executed simultaneously. Specifications change. Additional works emerge after opening machinery or inspecting steel. Delivery dates remain commercially critical.

 

Yet management is often hundreds or thousands of kilometres away.

 

The fundamental question becomes:

 

How does a ship manager get “eyes inside the shipyard” without physically being everywhere?

 

The answer is not another dashboard. It is a maritime project management platform that connects scope, schedule, cost, procurement, quality, documentation and actual execution into one controlled environment.

 

The Visibility Gap Between the Ship Manager and the Shipyard

 

Traditional ship-management ERP systems are excellent at managing the operational life of vessels: technical management, planned maintenance, procurement, crewing, accounting, compliance and voyage operations.

 

But a major drydock, conversion, retrofit or newbuilding programme behaves differently.

 

It has a defined scope, budget and completion date. It involves contractors and subcontractors. Work must be measured against progress. Variations need approval. Procurement must support scheduled work. Inspections and quality records must follow execution.

 

Most importantly, time and cost continuously interact.

 

When these activities are managed through spreadsheets, emails, messaging applications, isolated scheduling tools and reports from the yard, management receives fragments of the project rather than the project itself.

 

The result is a visibility gap.

 

Knowing that a purchase order was issued is not enough. Management needs to know which work package required it, whether that work is on schedule, whether the material has arrived, what it is costing against budget and whether a delay threatens vessel delivery.

 

Article content

 

Drydocking Is a Project — Manage It Like One

 

Consider a major drydock.

 

Before arrival, the ship manager already has a planned specification covering steel repairs, coatings, machinery overhaul, statutory surveys, class requirements, equipment replacement and scheduled upgrades.

 

Once the vessel enters the yard, reality starts changing the plan.

 

Inspections reveal additional steel renewal. Machinery requires unexpected repairs. Suppliers change delivery dates. Class requests additional work. The yard submits variations. New subcontractors become involved.

 

Every change potentially affects cost, schedule and redelivery.

 

A conventional workflow may document these events. A project-control platform should do something more important:

 

connect them.

That is the philosophy behind ProjectVIEW ERP.

 

ProjectVIEW is designed around an integrated project environment in which processes can be connected through the project dimensions of BoQ/Scope ↔ WBS/Schedule ↔ Cost Codes. The platform supports project portfolio management, workflows, analytics and centralized project data.

 

For ship managers, the terminology can be adapted to maritime operations: the drydock specification or work package becomes the commercial scope, the WBS represents planned execution, and cost codes provide the management and financial control structure.

 

Giving Management “Eyes in the Shipyard”

 

Digital visibility should begin where the work happens.

 

Project teams should be able to record progress, requests, inspections, resources, procurement events, documentation and changes from the yard rather than reconstructing what happened later at headquarters.

 

ProjectVIEW’s architecture is designed around centralized project information and controlled access from different locations and devices. Its project-specific implementation for shipbuilding and repair environments extends collaboration across the office, yards, production, vendors, service companies, subcontractors and clients, while associating project processes with scope, schedule and cost dimensions.

 

This changes the management question from:

 

“What is happening at the yard?”

 

to:

 

“Show me what changed since yesterday, what is behind schedule, what is exceeding budget and what requires my approval.”

 

That is genuine situational awareness.

 

From Shipyard Progress to Real-Time Cost Control

 

Progress without cost is incomplete information.

 

Cost without progress can be even more misleading.

 

Suppose 65% of the drydock budget has already been consumed while only 45% of the planned work has been completed. Or procurement commitments are increasing significantly while several critical work packages remain behind schedule.

 

Management needs to identify those deviations while intervention is still possible, not after receiving the final shipyard invoice.

 

ProjectVIEW’s business logic links budget and cost control with project scheduling and daily transactions, allowing actual project activity to be compared against the project baseline. Its cost-management methodology connects BoQ/scope, WBS and cost codes rather than treating the schedule and financial records as separate universes.

 

For ship managers, that means a drydock can become a continuously controlled project rather than a final-cost reconciliation exercise.

 

Procurement Must Follow the Project — Not Operate Beside It

 

Maritime projects are highly procurement-dependent.

 

Steel, coatings, spare parts, specialist equipment, OEM services and subcontracted works must arrive when the relevant activity needs them.

 

A purchase order being “approved” does not mean the project is protected.

 

The real questions are:

 

What activity requires the material? When is it required? Has the supplier confirmed it? Has it arrived? What happens to vessel redelivery if it does not?

 

ProjectVIEW connects material requests, requisitions, RFQs, supplier quotations, purchase orders, receipts and inventory processes within the wider project environment. Its procurement workflow can originate from project requirements and support supplier comparison, purchasing and material receipt.

 

For a ship manager, this makes procurement part of project execution rather than a disconnected administrative function.

 

Variations Cannot Become a Blank Cheque

 

One of the greatest commercial risks during drydocking is additional work.

 

Some variation is unavoidable. The problem begins when additional works are approved through fragmented emails, telephone conversations or spreadsheets without immediate visibility of their cumulative effect.

 

Every variation should answer four questions:

 

Why is it necessary? How much will it cost? What does it do to the schedule? Who approved it?

 

A structured workflow creates a traceable chain from request through technical assessment, commercial evaluation and approval to execution.

 

ProjectVIEW supports workflow-driven process control and centralized documentation, helping establish accountability over changes rather than allowing uncontrolled scope growth. Its shipyard-oriented configuration specifically incorporates real-time management of change requests alongside cost and progress control.

 

Quality Is Evidence, Not a Statement

 

For shipowners and ship managers, successful delivery is not simply getting the vessel out of drydock.

 

The project must leave behind an auditable record.

 

Inspection reports, certificates, approved drawings, test results, photographs, RFIs, punch lists, class documentation, equipment certificates and final records may later become essential evidence.

 

This matters not only internally but also when demonstrating project status and asset integrity to classification societies, financiers, charterers, insurers and other authorized stakeholders, depending on their contractual and regulatory requirements.

 

A centralized document environment with controlled access, versioning, workflows and project associations therefore becomes part of project governance rather than merely document storage. ProjectVIEW’s project environment incorporates centralized document management and controlled collaboration alongside operational workflows.

 

The objective is straightforward:

 

Do not tell stakeholders that the work was completed correctly. Be able to prove it.

 

One Platform Across the Maritime Project Lifecycle

 

The same principle applies far beyond drydocking.

 

A ship manager may simultaneously oversee a newbuilding programme in Asia, a scrubber or ballast-water retrofit, an engine conversion, a major repair following damage, a vessel life-extension programme and several scheduled drydockings.

 

Managing each through independent spreadsheets and email chains makes portfolio-level control extremely difficult.

 

A centralized project platform can establish a common operating model across these projects:

 

  • scope and work-package management;
  • project budgeting and cost control;
  • scheduling and progress;
  • procurement and materials;
  • subcontractor and service-company management;
  • change and variation control;
  • inspections, QA/QC and documentation;
  • approvals and audit trails;
  • management dashboards and project portfolio reporting.

 

ProjectVIEW was designed as a multi-company, multi-project environment, providing centralized project information and role-based analytics rather than isolating every project into another information silo.

 

ProjectVIEW is not a Replace to the Maritime ERP

 

This distinction is important.

 

A ship manager may already have a mature maritime ERP covering vessel operations, maintenance, purchasing, finance and crewing.

 

The objective should not necessarily be to replace it.

 

ProjectVIEW can become the project execution and control layer for capital-intensive maritime projects, while integrating with existing enterprise, financial, maritime and specialist systems where required.

 

ProjectVIEW provides an API framework and is designed for integration with third-party applications, while its project environment provides the business logic required for project-based execution.

 

In that architecture, the maritime ERP continues managing the vessel as an operational asset.

 

ProjectVIEW manages the project being executed on that asset.

 

That is a very different requirement.

 

From Remote Supervision to Digital Project Control

 

Ship managers do not need more reports from shipyards.

 

They need direct, structured and timely visibility into execution.

 

They need to know what was planned, what has been completed, what has changed, what has been committed, what has been spent, what remains outstanding and what threatens delivery.

 

For a USD 20 million drydock or a USD 500 million newbuilding programme, waiting for yesterday’s spreadsheet is not project control.

 

The future is a digital project environment where scope, time, cost, procurement, quality, documentation and accountability continuously reconcile against reality.

 

That is where ProjectVIEW ERP can complement maritime management systems: providing shipowners and ship managers with the project-control layer they need to put digital eyes inside the shipyard.

Christos Emmanouilidis

About the author

Eng. Christos Emmanouilidis

Chief Customer & Commercial Officer, DANAOS Projects

Eng. Christos Emmanouilidis is Chief Customer & Commercial Officer at DANAOS Projects and a subject-matter expert in construction cost control, industry-specific ERP and the digital transformation of project-based enterprises. A Civil Engineer with more than 25 years of international experience in engineering, construction management, quality and commercial strategy, he leads the global market development of ProjectVIEW ERP for construction, infrastructure,…

Search or Ask AI