Danaos

ProjectVIEW ERP | End-to-End Construction ERP

Executive Summary

 

DANAOS ProjectVIEW ERP provides a single, integrated platform that connects preconstruction with construction execution.

 

By linking Bills of Quantities (BoQ), Work Breakdown Structures (WBS), and Cost Codes—the “Cost Control Accounts”—the system first establishes a versioned baseline (e.g., V.0). This baseline unifies scope, schedule, and cost. In turn, it drives procurement, resource planning, site operations, subcontractor management, HR/payroll, fixed assets, finance, and reporting. As a result, every transaction stays traceable to a BoQ/WBS/Cost Code.

 

In short, the result is faster mobilization, controlled change, defensible variations, and reliable cost and productivity insight.

 

Article content

 

1) Preconstruction: Build a Defensible, Data-Driven Budget

 

1.1 Structure the project

 

  • Import or author BoQ and map each item to WBS activities and Cost Codes.
  • Then capture resource assemblies (materials, crews, equipment) per BoQ line to link time and cost to scope.

 

1.2 Establish the baseline (V.0)

 

  • Freeze the first integrated view of scope–time–cost as Version 0.
  • Subsequent changes (new BoQ items, WBS refinements, or re-coding) create new versions, enabling rigorous change/variation analysis against V.0.

 

1.3 Cost intelligence and risk reduction

 

  • First, calibrate estimates using cost recipes and productivity templates proven on prior projects (lessons learned).
  • In addition, pull historic prices and request fresh quotations from vendors/subcontractors through the Procurement module to minimize guesswork.
  • Also include labor costs (by specialty/grade with payroll averages) and equipment costs managed centrally.

 

1.4 Digital takeoff and document control

 

  • Integrate with BIM and connected drawings for Quantity Take-Off (QTO) and cross-checks between Excel BoQs, models, and drawings.
  • Then store GCC/SCC, designs, drawings, and all supporting files in the built-in Document Management System (DMS) for controlled distribution.

 

1.5 Bid optimization

 

  • Run management bid scenarios that tune margins and strategy. At the same time, these scenarios run without breaking the resource structure that underpins traceability later in construction.

 

2) Construction: Execute with Control and Traceability

 

2.1 Site Operations & Materials Flow

 

  • Site Item Request (SIR): First, the site raises requests for materials/services per BoQ/WBS/Cost Code.
  • Availability Dashboard: Next, the materials controller sees on-hand stock vs. shortfalls.
  • If not available: Procurement issues a Materials Request Form (MRF), manages sourcing, and receives through Goods Receipt Note (GRN) with inspection workflow. Items then move to warehouse or direct consumption.
  • If available: Transfer from warehouse/adjacent site via Store Issue Voucher (SIV).
  • Finally, the system ties all movements to project coding, supporting Just-In-Time supply and clean audit trails.

 

2.2 Resource Planning & Work Orders

 

  • First, translate rough-cut resource plans from preconstruction into specific crews and equipment based on availability.
  • Then the system performs algorithmic resource leveling (e.g., linear techniques) across time, cost, and capacity constraints.
  • Issue Work Orders showing the planned resources for upcoming days. As a result, any change automatically re-levels and reschedules.

 

2.3 Production / Fabrication (Project-Tied)

 

  • Manage off-site production (e.g., metalwork, precast) with BoQ/WBS-specific fabrication orders.
  • Also allocate shared shop/yard resources, track progress, costs, and delivery back to the project.

 

2.4 Machinery & Maintenance

 

  • End-to-end Plant & Equipment Management covering fixed and construction assets, tools, toolboxes, and scaffolding.
  • Support for preventive, predictive, and corrective maintenance, integrated with spares via Warehouse/Procurement.

 

2.5 HRMS, Labor & Productivity

 

  • Central HR master data and Employee Self-Service (ESS) Portal for requests and document updates (passports, certifications).
  • Camp Management for accommodation logistics.
  • Payroll configured to local legislation and integrated with major banks per country.
  • Employee Daily Transactions (EDT) capture time by WBS/BoQ, overtime, and crew deployment. In addition, integration with biometrics enables high-fidelity productivity analytics.

 

2.6 Subcontractor Management\

 

  • Digital Subcontractor Portal for progress submissions, resource declarations, and certifications.
  • Tight alignment from procurement → contract management → valuation and payment, including retentions and deductions, all mapped to BoQ/WBS.

 

2.7 Financial Alignment

 

  • Continuous synchronization between project cost and financial accounting: payables, receivables, cashflow, and revenue recognition align with project coding.
  • Robust variation control using baseline versions (V.0, V.1, …) to justify changes and reconcile with contract value.

 

3) Governance, Reporting, and Decision Support

 

3.1 Cost & Performance Control

 

  • Earned Value Management (EVM) and Project KPIs at activity, WBS, and portfolio level.
  • Drill-down analytics by BoQ/WBS/Cost Code, resource category, subcontractor, location, or time period.

 

3.2 Dashboards & Daily Construction Log

 

  • Consolidated daily view combining EDT (labor), machinery operations, materials movements, and progress of works—your single Daily Construction Log.

 

3.3 Workflow & Collaboration

 

  • A configurable workflow engine orchestrates approvals across departments (site, procurement, HR, finance), ensuring separation of duties and timely decisions.
  • In addition, multilingual, multi-company, and multi-currency support facilitates regional rollouts and shared-services models.

 

4) Technology & Deployment

 

  • Architecture: Tier-1 ERP available on the Danaos Cloud or on-premises.
  • Integration: BIM/QTO, spreadsheets, biometrics, banking interfaces, and third-party systems through secure APIs.
  • Security & Records: Centralized DMS with versioning, permissions, and auditable distribution.

 

Why This Matters

 

  • Traceability from day one: The BoQ↔WBS↔Cost Code link—frozen in a versioned baseline—remains intact through procurement, field execution, and finance.
  • Change you can defend: The system quantifies every variation against the original baseline, with underlying quantities, recipes, and prices fully documented.
  • Operational speed with control: Just-In-Time materials, leveled resources, and digital subcontractor flows compress cycle times without losing governance.
  • Measurable productivity: Similarly, EDT and equipment logs turn labor and plant usage into actionable KPIs.
  • One source of truth: In practice, site and office work off the same structured data, eliminating reconciliation headaches.

 

Glossary (selected)

 

  • BoQ (Bill of Quantities): Itemized list of works with quantities and prices.
  • WBS (Work Breakdown Structure): Hierarchical decomposition of deliverables/activities.
  • Cost Codes / Cost Control Accounts: The accounting lens for tracking costs to activities/scope.
  • SIR / MRF / GRN / SIV: Site Item Request / Materials Request Form / Goods Receipt Note / Store Issue Voucher.
  • EDT: Employee Daily Transactions (time & productivity capture).
  • EVM: Earned Value Management.

 


 

Overall, ProjectVIEW ERP replaces fragmented tools with a coherent operating system for construction. By anchoring everything to the BoQ–WBS–Cost Code triangle and preserving versioned baselines, it turns bids into executable plans. It then turns plans into traceable field activity. Finally, it turns activity into reliable financials and KPIs—across languages, companies, and geographies.

 

 

 

 

 

 

 

 

 

Christos Emmanouilidis

About the author

Eng. Christos Emmanouilidis

Chief Customer & Commercial Officer, DANAOS Projects

Eng. Christos Emmanouilidis is Chief Customer & Commercial Officer at DANAOS Projects and a subject-matter expert in construction cost control, industry-specific ERP and the digital transformation of project-based enterprises. A Civil Engineer with more than 25 years of international experience in engineering, construction management, quality and commercial strategy, he leads the global market development of ProjectVIEW ERP for construction, infrastructure,…

Search or Ask AI