Danaos

Blueprint: Shipyard Management with DANAOS ProjectVIEW ERP

From design → cost modelling → fabrication → dock operations → delivery

 

ProjectVIEW ERP acts as the Operating System of the Shipyard, orchestrating

 

  • engineering,
  • production,
  • procurement,
  • subcontracting,
  • cost control, and
  • yard operations

 

as one integrated ecosystem. It digitizes every commercial, operational, and financial process—linking BoQ, WBS, and Cost Codes into a single source of truth .

 


 

1. Engineering Integration & BoQ Transformation

 

1.1 Engineering Document Intake

 

Shipyards receive large volumes of engineering documents: class drawings, system diagrams, specs, material lists, outfitting drawings, welding maps.

 

ProjectVIEW provides a structured Document Management module (drawings, specs, contracts) integrated across all processes .

 

1.2 BoQ Generation or Import

 

From the client specifications, the BoQ is:

 

  • Imported directly from any Excel format via the Import Wizard
  • Transformed into a structured, hierarchical BoQ (multi-level tree)
  • Linked to drawings, SCC/GCC, and supporting documents for full traceability

 

BIM / 2D QTO Integration When available, ProjectVIEW connects BoQ → BIM → 2D CAD via:

 

  • ExtrAXION QTO Add-on for quantity extraction from drawings
  • IFC-based BIM connector to synchronize quantities, changes, and revisions

 

This ensures the shipyard’s estimate is always aligned with the latest engineering data.

 


 

2. Cost Modelling Through Standard Work Orders (Cost Recipes)

 

A shipyard does not estimate every activity from scratch. ProjectVIEW enables industrialized cost modelling by using:

 

2.1 Cost Recipes / Productivity Templates

 

These contain historical, proven production norms (welding inches, fabrication hours per ton, blasting/marine coating rates, machinery hours, consumables). They are part of the knowledge base of the system and are auto-applied to each BoQ line.

 

2.2 Resource Allocation

 

For each BoQ item, the system automatically assigns:

 

  • Labor specialties (fitters, welders, riggers)
  • Machinery (cranes, forklifts, compressors)
  • Materials / consumables
  • Subcontractor packages
  • Indirect resources

 

Historic prices, past productivity, and updated supplier rates are sourced from the Procurement & Cost DB module .

 

2.3 Realistic Cost Calculation

 

Using:

 

  • Direct costs
  • Indirect costs
  • Past productivity metrics
  • Updated cost databases
  • Risk, overhead, and profit multipliers

 

The system produces a realistic fabrication and repair cost baseline, not an academic estimate.

 


 

3. Planning Integration: BoQ ↔ WBS ↔ Schedule

 

The BoQ-generated budget is mapped to the project’s WBS (Primavera or MS Project via native connectors) :

 

  • Each BoQ line is tied to scheduled activities
  • Duration and resource loading come from Primavera
  • The result: 5D integrated planning—time, cost, quantities, resources, and method statements updated dynamically.

 

ProjectVIEW becomes the “single reality” of cost-time alignment.

 


 

4. Proposal Submittal: Cost, Gantt, Risks & Alternatives

 

Once estimation is complete:

 

  • ProjectVIEW generates the full proposal package (BoQ pricing, schedules, alternatives, risks, OH, profit)
  • What-If bidding scenarios allow multiple cost and schedule variations for negotiation
  • The final Excel/XLS submission is auto-produced for the shipowner

 


 

5. Contract Management & Dynamic Change Control

 

5.1 Contract Creation

 

The awarded contract is auto-created from the budget, inheriting BoQ structure, pricing, quantities, and linked documents (drawings, specs) .

 

5.2 RFI & Change Requests

 

Changes (variations) come from:

 

  • Engineering revisions
  • Owner’s instructions
  • RFIs
  • Additional works during dry docking

 

ProjectVIEW handles these via dynamic approval workflows with client-side digital sign-off:

 

  • New scope items enter directly from the Site RFI module
  • Each change carries costs, schedule impact, and justification documents
  • Audit trail ensures transparency

 

This protects the shipyard from scope creep, strengthens claims, and improves cash flow recovery ratios.

 


 

6. Production & Fabrication Control

 

Shipyards rely heavily on accurate production control. ProjectVIEW manages:

 

6.1 Work Orders

 

Work Orders connect:

 

BoQ → Drawing → Workstation → Team → Time → Cost

 

Each WO:

 

  • Shows required materials, labor, machinery
  • Inherits specs, tolerances, weld procedures
  • Links to supporting drawings and revision history
  • Defines checklists, QA/QC requirements

 

6.2 Shop Production Monitoring

 

Daily progress reporting includes:

 

  • % or quantity completion per activity
  • Labor timesheets (per specialty)
  • Machine usage logs
  • Consumables and spare parts usage
  • Subcontractor progress

 

These transactions update the Cost Control engine in real time (Budget vs Actual) .

 

6.3 Labor Productivity

 

Labor productivity dashboards correlate:

 

Actual output vs. Cost Recipe baseline Actual hours vs. Estimated hours Crew productivity per shift Delayed zones / bottlenecks

 


 

7. Machinery, Tools & Yard Operations

 

7.1 Machinery Management

 

ProjectVIEW’s machinery module handles:

 

  • Equipment database
  • Requests & allocation
  • Preventive maintenance
  • Fuel consumption
  • Insurance & compliance deadlines
  • Cost analysis & location calendar

 

(Full lifecycle per module description) .

 

7.2 Dock, Berth & Yard Planning

 

While drydock-specific planning may require dedicated algorithms, ProjectVIEW provides:

 

  • Gantt-based yard activity scheduling
  • Crane allocation
  • Equipment schedules
  • Material staging plans
  • Collision checks through workflows
  • Integration with Primavera for overall dock occupancy plans

 

ProjectVIEW becomes the orchestrator of yard-wide operations.

 


 

8. Procurement, Materials & Inventory

 

Shipyards rely on heavy procurement cycles. ProjectVIEW:

 

  • Starts procurement from BoQ + Work Orders
  • Triggers eRFQs, supplier portals, e-auctioning
  • Compares quotations, generates POs automatically
  • Monitors delivery, warehouse movements, batch codes, certificates
  • Ensures traceability of every material to its work package

 

Materials are matched to WBS and Cost Codes, feeding real-time cost control.

 


 

9. Subcontractor Management

 

From subcontract packages to certificates:

 

  • Subcontracts created from PO or BoQ
  • Progress measured via certificates
  • Deductions, retention, penalties auto-calculated
  • Changes flow back through the variation system
  • Payment certification aligns with actual progress

 

This eliminates disputes and enhances cost governance.

 


 

10. Cost Control, Reporting & Business Analytics

 

ProjectVIEW’s strongest differentiator is quantum cost control:

 

10.1 Real-Time Actual vs Budget

 

Every daily transaction updates:

 

  • Earned value
  • Commitments
  • Actual costs vs baselines
  • Productivity deviations

 

10.2 Role-Based Dashboards

 

Custom dashboards show:

 

  • Zone/department performance
  • Cost leakage
  • Procurement delays
  • Change order exposure
  • Production bottlenecks

 

Business analytics module is included in all major shipyard implementations .

 


 

11. Connected Documents: The Backbone of Transparency

 

Every step links supporting documents:

 

  • Drawings & revisions
  • Contracts & SCC/GCC
  • Purchase Orders
  • Inspection records (RFI)
  • Welding logs
  • QA/QC forms
  • Change requests
  • Certificates
  • Delivery notes

 

This creates a digital audit-ready environment, critical for classification society compliance, warranty claims, owner transparency, and ISO/QHSE audits.

 


 

12. Strategic Value for the Shipyard

 

Competitive Advantage

 

With ProjectVIEW:

 

  • Owners see transparent progress & justified changes
  • Production is predictable, costed, and controlled
  • Claims are better documented and approved faster
  • Yard planning is coordinated, reducing delays
  • Data-driven decisions reduce rework and overruns
  • Financial performance improves through accurate forecasting
  • The shipyard becomes more credible, reliable, and efficient

 

ProjectVIEW ERP increases revenue potential, improves service quality, and differentiates the yard from global competitors.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Christos Emmanouilidis

About the author

Eng. Christos Emmanouilidis

Chief Customer & Commercial Officer, DANAOS Projects

Eng. Christos Emmanouilidis is Chief Customer & Commercial Officer at DANAOS Projects and a subject-matter expert in construction cost control, industry-specific ERP and the digital transformation of project-based enterprises. A Civil Engineer with more than 25 years of international experience in engineering, construction management, quality and commercial strategy, he leads the global market development of ProjectVIEW ERP for construction, infrastructure,…

Search or Ask AI